ORDU - ELECTRIC MECHANICAL SERVICE CONSTRUCTION AND MAINTENANCE OPERATION BETWEEN TOPAC 17 PIECES OF TUNNEL
Work Name: Ordu-Ulubey Ayrımı TOPÇAM Km: 0 + 000-35 + 000 Between 17 Tunnels Electrical, Electronic, Electromechanical and Various Control Systems Construction work.
Contract Date: 04.12.2017
Starting Date: 13.12.2017
- We make JET FAN Assemblies for 300mm and 200mm Pan installations and Ventilation inside the tunnels.
- 15.000mt Pan installation and 32 Ad Jet Fan installation. Work continues.